About Faseeh
English
Native or bilingual
Experience
- PAECPrincipal EngineerENERGY AND UTILITIESNovember 2009 - July 2025 (15 years and 8 months)Islamabad, PakistanI have over 15 years of professional experience in the nuclear power industry with the Pakistan Atomic Energy Commission (PAEC), where I contributed to multiple large-scale projects from concept to completion. My career has been focused on electrical engineering, project management, and contract management, giving me a strong foundation in both technical and managerial domains.Key Areas of Expertise:Electrical Design: Developed and reviewed electrical system layouts, schematics, and specifications in compliance with international codes and nuclear safety standards.Electrical Installation: Supervised and executed installation of high- and low-voltage systems, switchgear, control systems, and auxiliary power distribution networks.Commissioning: Led testing and commissioning of critical electrical systems, ensuring performance, reliability, and regulatory compliance before integration into plant operations.Contract Management: Handled the complete contract cycle, from tender preparation and technical bid evaluation to vendor coordination, procurement, and contract closeout.Project Management: Oversaw the complete project life cycle, including planning, resource allocation, execution, quality assurance, and timely delivery of nuclear infrastructure projects.Throughout my tenure, I worked on some of the most complex and safety-critical projects in Pakistan, contributing to the successful completion and operation of nuclear power plant units. This experience has equipped me with not only deep technical expertise but also strong problem-solving, stakeholder management, and leadership skills that translate effectively into industrial, energy, and infrastructure projects.
- Hinkley Point C (HPC)Senior Electrical EngineerENERGY AND UTILITIESJuly 2025 - Today (11 months)Bristol, United KingdomI am currently working with Hinkley Point C (HPC) nuclear power project. In this role, I am responsible for the preparation of electrical documents for the Nuclear Island, ensuring that all activities meet nuclear safety, quality, and regulatory standards.Key Responsibilities:Acting as senior engineer for developing and approving electricaldocuments covering critical nuclear systems.Preparing detailed documentation to enable the safe, systematic, and compliant startup of electrical equipment and systems.Ensuring alignment of procedures with EDF requirements, international nuclear safety codes, and project-specific specifications.Coordinating with design, construction, and commissioning teams to ensure smooth handover and integration.Supporting technical reviews and risk assessments, maintaining strict adherence to nuclear safety culture.This position allows me to apply my extensive electrical expertise, while contributing to one of the most advanced nuclear infrastructure projects in Europe.
Recommendations
Be the first to recommend Faseeh
Help this freelancer shine by sharing your experience working together.
These freelancer profiles also match your criteria
Agatha Frydrych
Backend Java Software Engineer
4.7
(3)
2
Baptiste Duhen
Fullstack developer
4.6
(4)
5
Amed Hamou
Senior Lead Developer
4
(2)
7
Audrey Champion
Web developer
4.3
(3)
4
Education
- MS Systems EngineeringPIEAS2009Masters Degree in Systems Engineering
- BSc Electrical EngineeringNWFP UET Peshawar2007Electrical Engineering